The decision to standardize a distribution network on 10kV, 20kV, or 35kV is usually made once, early in a project's planning, by whoever is designing the distribution system layout — and then lived with for decades by everyone who specifies, maintains, and expands equipment on that network afterward. It's a decision that gets far less attention than kVA sizing or cooling class, despite having a bigger long-term impact on how many substations a network needs, how far power can travel before losses become significant, and how much flexibility exists for future load growth.

This guide compares 10kV vs. 20kV vs. 35kV transformers from a distribution planning standpoint — what actually changes between these voltage classes, and how to decide which one fits a given project.

Distribution Voltage Class Selection Flowchart
Which voltage class fits your project? — 10kV vs 20kV vs 35kV
New or Expanding Distribution Project?
 
Project Type & Growth Profile?
 
 
10kV
Small commercial or light industrial site
Limited future growth · Lowest cost & footprint
 
20kV
Growing industrial park, campus, or urban development
Multiple future phases · Extended supply radius
 
35kV
Large single industrial load or long feeder distances
Significant anticipated growth · Higher capacity
 
Match
Expanding an existing distribution network
Match existing voltage class unless full redesign planned
Decision framework for new vs. expanding distribution projects. Matching the existing voltage class avoids protection coordination
and equipment compatibility complexity. Source: AISITE voltage class selection guide.
Figure 1. Distribution voltage class selection flowchart — a decision framework for new and expanding projects.

What Changes Between 10kV, 20kV, and 35kV Class Transformers

Beyond the obvious difference in primary voltage rating, moving between these classes changes several practical specification details:

  • Insulation level and clearances scale with voltage class, meaning a 35kV-class transformer requires more internal insulation distance and generally a larger physical footprint than a 10kV unit of comparable kVA rating.
  • Typical short-circuit impedance shifts by class and cooling type. Oil-immersed units in the 20kV class commonly run around 5.5–6% impedance, while dry-type units in the same class often run closer to 6%, figures worth confirming against your specific protection coordination study rather than assuming a generic value applies.
  • Vector group conventions remain broadly consistent across classes (commonly Dyn11 or Yyn0 for medium-voltage distribution transformers), so voltage class alone doesn't change how paralleling or grounding is approached — but any equipment mixed across classes still needs the same vector group, ratio, and impedance verification covered in standard paralleling practice.

Why 20kV Delivers More Than "Just a Higher Number"

It's easy to treat 20kV as simply "20kV instead of 10kV" — a bigger number that requires more expensive insulation for no obvious benefit unless a load genuinely demands it. In practice, stepping up a distribution network's voltage class delivers benefits that compound at the system level, not just the individual transformer level:

  • Supply radius extends meaningfully. For a given load density, a 20kV distribution class can serve roughly 1.26 times the supply radius of an equivalent 10kV network, which directly reduces how many substations a given service area needs.
  • Coverage area per substation grows further still, with a 20kV network able to cover roughly 1.6 times the area of a 10kV network at the same load density — a meaningful factor when planning substation count and siting for a large campus, industrial park, or expanding urban area.
  • Line losses drop substantially at the same load level. At comparable loading, a 20kV distribution network can see line losses around a quarter of what an equivalent 10kV network would experience, translating into lower energy cost over the life of the network, not just a one-time equipment consideration.
Supply Radius & Coverage Area Comparison
At equivalent load density — why 20kV reduces substation count
1.0x 1.26x 1.58x 10kV 20kV 35kV Area = 1.0x Area ≈ 1.6x Area ≈ 2.5x Supply radius
10kV — baseline
20kV — 1.26× radius
35kV — further extension
Metric (at equivalent load density) 10kV 20kV 35kV
Relative supply radius 1.0× 1.26× ≈1.58×
Relative coverage area per substation 1.0× ≈1.6× ≈2.5×
Relative substation count for same area 1.0× ≈0.63× ≈0.40×
Supply radius and coverage area scale with voltage class at equivalent load density. A 20kV network can cover roughly 1.6× the area
of a 10kV network, reducing substation count and land use. 35kV figures are indicative and depend on load density and feeder design.
Figure 2. Supply radius and coverage area comparison — a 20kV network covers roughly 1.6× the area of a 10kV network at equivalent load density.

This is why many utilities and large industrial campuses planning greenfield distribution networks are shifting toward 20kV as a new baseline rather than defaulting to legacy 10kV standards — the case isn't about individual transformer specifications, it's about the substation count, land use, and loss profile of the network as a whole.

When 35kV Makes Sense: Large Loads and Reduced Substation Count

Stepping up further to 35kV-class equipment makes the most sense for:

  • Large industrial loads and campuses where a single point of supply needs to serve substantial aggregate demand without a proliferation of intermediate substations.
  • Projects with significant future load growth expected, where standardizing on a higher voltage class up front avoids a costly network-wide voltage class conversion later — a project few operators want to undertake once a distribution network is built out and energized.
  • Sites with long feeder runs to the point of use, where 35kV's lower per-unit-distance loss characteristic compared to 10kV or 20kV becomes economically significant over the feeder's operating life.

The trade-off is a larger physical footprint and typically higher upfront equipment cost for comparable kVA capacity, which is why 35kV isn't the default choice for smaller commercial or light industrial projects where 10kV or 20kV already meets the load and growth requirements comfortably.

Line Loss Comparison at Equivalent Load
Relative line losses — 10kV baseline vs 20kV vs 35kV
100%
75%
50%
25%
0%
100%
 
10kV
baseline
≈25%
 
20kV
≈1/4 of 10kV losses
≈11%
 
35kV
further reduction
At comparable loading, a 20kV distribution network can see line losses around a quarter of an equivalent 10kV network — lowering energy cost
over the network's operating life. 35kV figures are indicative and depend on feeder length, conductor size, and load profile.
Figure 3. Line loss comparison at equivalent load — a 20kV network sees roughly one-quarter the line losses of a 10kV network at the same load level.

Retrofit and Compatibility Considerations: Why You Can't Simply Swap Voltage Classes

A distribution transformer's primary voltage rating is fixed by design — a transformer built for 35kV input cannot simply be substituted onto a 10kV feeder or vice versa without the equipment being severely underutilized or, in the reverse direction, subjected to overvoltage that risks insulation failure. This has a direct practical consequence for any project considering a future voltage class change: it's not a transformer swap, it's a distribution network redesign, since switchgear, protection settings, and often the physical substation layout are all built around the class chosen at the outset.

For projects genuinely uncertain about long-term load growth, this argues for erring toward the higher voltage class when the cost difference is modest, since converting a 10kV network to 20kV or 35kV years later is a far larger undertaking than the incremental cost of specifying the higher class from day one.

A Decision Framework for New vs. Expanding Projects

Scenario Typical Fit
Small commercial or light industrial site, limited future growth expected 10kV — lowest equipment cost and footprint for straightforward loads
Growing industrial park, campus, or urban development with multiple future phases 20kV — extended supply radius and substation coverage reduce long-term infrastructure count
Large single industrial load, long feeder distances, or significant anticipated growth 35kV — supports higher aggregate capacity with lower per-unit-distance losses
Expanding an existing network Match the existing voltage class unless a full network redesign is already planned — mixing classes on one network multiplies protection coordination and equipment compatibility complexity

A Practical Checklist

Before finalizing your voltage class decision:

  • Has the distribution voltage class decision been made based on the network's expected growth and footprint, not just the current load's kVA requirement?
  • For projects considering 20kV, has the reduction in substation count and land use been weighed against the incremental equipment cost compared to 10kV?
  • For large or long-feeder projects, has 35kV's loss advantage been evaluated against its larger physical footprint and higher upfront cost?
  • If expanding an existing network, has the existing voltage class been confirmed and matched, rather than introducing a second class that complicates future paralleling and protection coordination?

Frequently Asked Questions

Can I connect a 35kV transformer to a 10kV system?
No. A transformer's primary winding is designed for a specific rated voltage; applying a significantly different voltage either severely underutilizes the insulation system (too low) or risks overvoltage and insulation failure (too high). The transformer must match the network's actual voltage class.
Is 20kV always better than 10kV?
Not universally — 20kV offers a longer supply radius, broader substation coverage, and lower line losses at comparable load density, but at a higher equipment cost and larger footprint per unit. For small loads with limited growth expectations, 10kV often remains the more economical choice.
Why would a project choose 35kV instead of 20kV if it costs more?
Primarily for large aggregate loads, long feeder distances, or significant anticipated future growth, where 35kV's lower per-unit-distance losses and higher capacity per substation offset the larger upfront equipment investment over the network's operating life.
Can a distribution network mix voltage classes?
Technically yes in some configurations, but it significantly increases complexity for protection coordination, equipment compatibility, and future expansion planning. Most networks are designed to standardize on a single voltage class specifically to avoid this complexity.

Final Thoughts

Choosing between 10kV, 20kV, and 35kV isn't primarily a transformer specification decision — it's a distribution network planning decision that happens to determine which transformer class you'll be specifying for decades afterward. Weighing supply radius, substation count, and loss characteristics against your project's actual growth expectations, rather than defaulting to whatever voltage class a legacy network happens to use, is what prevents an expensive network-wide conversion years down the road.

Once you've settled on a voltage class and received equipment, our guide on how to read a transformer nameplate covers how to confirm the unit's actual ratings match your specification, and our comparison of on-load vs. off-circuit tap changers is worth reviewing if your project's voltage class decision also involves choosing a voltage regulation approach.