Transformer Partial Discharge: Causes, Testing, Limits
Classification:
Industry News
Release time:
2026-10-19
Partial Discharge in Transformers: Causes, Testing and Acceptable Limits
What Partial Discharge Is and Why It Matters
Each discharge event is very small, but it repeats thousands of times per second. It erodes the insulation at its source, and the damage can grow until a full breakdown occurs.
- It is progressive. A transformer with active PD usually keeps operating normally in the early stages.
- It can't be seen from the load side. Temperature and current look normal, so it needs a dedicated test.
- Dry-type units have no liquid buffer. In a liquid-filled transformer, oil can partly cool and quench small discharges. A dry-type transformer relies on solid insulation and air.
Where PD Starts
| Type | Typical cause | Where |
|---|---|---|
| Internal (void) discharge | Gas voids or cracks in solid insulation | Cast resin coils, bushings |
| Corona | Sharp edges or high electric field at a point | Terminals, leads, core edges |
| Surface discharge and tracking | Moisture, dust or contamination on a surface | Coil surfaces, supports |
| Gas bubbles and floating parts | Gas in oil, loose metal pieces | Oil-immersed units |
PD tends to develop in predictable places, such as coil ends, the high-voltage terminals, and where cables are connected.
How PD Is Measured
- Unit: apparent charge in pC, measured with a calibrated circuit as described in IEC 60270.
- Factory test: for dry-type transformers, the PD test is normally combined with the induced voltage test. According to test-equipment documentation, it is required for dry-type units above 3.6 kV under IEC 60076-11 and IEEE C57.12.01.
- Typical limits: commonly cited limits are about 10 pC for solid cast windings and about 50 pC for resin-encapsulated windings. The exact value comes from the standard and your specification.
- Liquid-filled units: PD is measured during the induced voltage test, with the acceptance level agreed in the specification. For distribution transformers it is often requested as a special test.
IEC 60076-11 covers dry-type power transformers up to a highest voltage for equipment of 72.5 kV. Always confirm the edition and limits in your contract.
Reading the Numbers: A Worked Example
| Stage | PD level (illustrative) |
|---|---|
| Factory test | 8 pC |
| Commissioning on site | 11 pC |
| 12 months later | 29 pC |
Every value is still low in absolute terms, but the level has more than doubled in a year. The right response is to re-test within a few months, inspect for dust and moisture, check cable terminations, and compare with the factory baseline. A stable reading close to the factory value is generally unremarkable, while a steady climb is the signal.
How to Reduce PD
In design and manufacturing
- Vacuum casting and curing to avoid voids in cast resin coils.
- Rounded edges and field grading to limit corona.
- Clean, controlled production and routine PD testing of every unit.
On site and in service
- Keep the room dry, ventilated and clean. Moisture and airborne pollution promote surface discharge.
- Install cable terminations carefully with proper stress control and clearances.
- Add space heaters or humidity control in damp locations.
- Schedule inspections as in our dry-type transformer maintenance checklist.
For critical sites, online PD monitoring (for example, high-frequency or acoustic sensors) can trend activity between outages.
PD Is One Test Among Several
PD shows the condition of the insulation, but it works best alongside other checks:
- Dielectric strength: see BIL explained for impulse levels.
- Temperature and aging: see dry-type transformer overheating and the transformer lifespan guide.
- Factory verification: see factory acceptance testing for export transformers.
- Insulation materials: see cast resin vs VPI transformers and how to choose insulation materials and classes.
What to Put in Your RFQ
- PD test required for every dry-type transformer, with the standard (for example IEC 60076-11) and the acceptance limit in pC.
- Test voltage and measuring method per IEC 60270, with the background noise level reported.
- Results per phase in the test certificate, not only a pass/fail statement.
- Witness test option for large or critical orders.
- Final-configuration retest on site if cable runs or enclosures are unusual.
- For oil-immersed units, specify whether the induced voltage test with PD measurement is required as a special test.
Our procurement and RFQ guides list the other parameters to include.
Matching Products to PD Requirements
| Need | Aisite option |
|---|---|
| Indoor dry-type distribution | 10KV Dry type transformer (Yyn0, Dyn11) and 20KV Dry type transformer |
| Oil-immersed distribution | 10KV Oil Immersed Transformers and 20KV Oil Immersed Transformer (11–33 kV, 50 kVA–20 MVA) |
| Higher voltage | 35KV Oil Immersed Transformer |
| Packaged installation | Compact substation and HV LV Switchgear |
| Specific PD limit, test voltage or witness test | Customized Transformer |
Pre-Order and Commissioning Checklist
- PD acceptance limit (pC) and standard written into the specification
- Per-phase PD results required in the test certificate
- Factory baseline kept for later comparison
- Site tested in the final configuration
- Room humidity, ventilation and cleanliness planned
- Re-test interval and trend alarm level defined
- Online monitoring considered for critical units
FAQ
What is an acceptable PD level in a transformer?
It depends on the standard and your specification. For cast resin dry-type transformers, around 10 pC is a commonly cited target. The trend over time is as important as the absolute value.
Does partial discharge mean the transformer will fail?
Not immediately. It is a progressive process, and the risk depends on the level, the location and how fast it grows.
Can PD be measured while the transformer is energized?
Yes. Online methods use special sensors. Offline tests, such as the factory induced test, give the most accurate baseline.
Do oil-immersed transformers need PD tests?
They are often measured during the induced voltage test, especially for higher voltages, and can be specified as a special test for distribution units.
Can Aisite quote to a specific PD limit?
Yes. Send your standard, limit and test requirements, and our engineers will review them through the Customized Transformer line.
Get a Project-Specific Recommendation
Send your voltage, kVA rating, installation conditions and test requirements, and our engineers will suggest a configuration.
Contact us Browse full product rangeThis guide is general engineering information. Acceptance limits and test methods must follow the applicable standard edition and your contract.